The Haul calculator allows you to:
Calculate the number of trucks required to complete the haul in a set amount of time
Calculate how long it will take to complete the haul with a set number of trucks
Neither
Both
The Trench Calculator allows you to quickly calculate ___________ values.
Trench
Pipe
Bedding
All of the above
For the in-field calculator, what symbol needs to be at the beginning of the math equation for it to calculate?
+
–
=
(
As a result of this lesson, you can:
Use the Haul Calculator
Use the Trench Calculator
Use the In-Field Calculator